Calomax Quantum User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
Page 4
LOCATION
To comply with recommendations
from the health and safety executive
it is important that due consideration
be given to safe operation of the
controls of the boiler. The boiler
should therefore be mounted in such
a manner that the operator can stand
directly facing the machine with the
controls at a recommended height
from the floor of 1200mm +/- 100mm.
Consideration should also be given
to the servicing requirements of the
machine. The maximum and minimum
ambient operating conditions must be between 5 °C and 35 °C.
The appliance is not suitable for installation where a water jet
could be used. Install the boiler on a surface suitable for near
boiling temperatures and the working weight of the boiler. Allow
adequate clearance for ventiation and for the easy removal of
the outer casing lid and rear panel. Calomax ltd recommend a
minimum clearance of 50mm on all sides of the boiler A suitably
qualified engineer must install this unit. Plumbing and electrical
installation work is involved.
INSTALLATION
All metalic components of the machine, in direct contact with
drinking water are manufactured from high quality 304 grade
stainless steel, or non ferrous materials, providing maximum
resistance to corrosion.
CONSTRUCTION
The boiler must be installed in a location where access is
restricted to operators that are suitably trained, or where
untrained operators of the machine can be supervised by trained
personnel.
1200 ±100
Page view 3
1 2 3 4 5 6 7 8 9 ... 23 24

Comments to this Manuals

No comments